Turnkey construction of a single unit extension to the plant consisting of a lignite fired steam boiler and turbine-generator set (157 MW electric power capacity), Coal Handling System, Flue Gas Desulphurization Plant, Raw Water Supply System and Water Treatment Plant is implemented.
Country: Turkey
Flue gas desulphurization plant for 2×150 MW Cayirhan Thermal Power Plant Units I & II, consisting of 2 ea. 100 m high scrubbers, auxiliary systems and ancillary buildings.
GAMA Industry is responsible for detail design of all civil works, buildings, locally fabricated structural steel and equipment, complete electrical and instrumentation installation, and start-up and commissioning of the plant.
The Soma-B Power Plant consisting of six coal-fired production units and auxiliary systems, was constructed on a turn-key basis and in three stages as follows:
- Stage: Construction of 2×165 MW Units 1 & 2
- Stage: Construction of 2×165 MW Units 3 & 4, including ash dam and hydraulic transport system
- Stage: Construction of 2×165 MW Units 5 & 6
Erection of two 30 MW steam generators, 30 MW turbo generator and 20 MW turbo blower.
Manufacturing, construction and erection works of a Hydrogen Peroxide (H2O2), and Carbon Monoxide and Hydrogen plant.
Turnkey construction of the 670 ton/hr Iron Ore Concentration Plant including the thickener systems, turbo screens, magnetic separators, feeders and conveying system, pumps, compressors.
Erection of 37 km. long, 4″-44″ diameter pipeline for Izmir Aliaga Refinery.
Turnkey construction and erection of the 25,000 t/yr Sodium Bichromate and 8,500 t/yr Sodium Sulfide Complex.
The scope of GAMA includes civil construction, steel structure, stack, piping, mechanical and electrical installations of all equipment such as kilns, furnaces, electroprecipitators, pre-heaters, tanks, vessels, pumps and compressors, transformers and switch gears.
Design, supply and construction of a unique coal conveyor system, extending from Denis coal mines to Soma Power Plant was performed by GAMA in two phases. A 8,500 m long, single line, down hill belt conveyor system are constructed during the first phase whereas two 5,500 m long lines were installed during the second phase.
The conveyors have a capacity of 1,000 tons/hr each, a belt width of 1,000 mm and belt speed of 4.5 m/sec.
The Project was executed in technological partnership with KRUPP Industritechnik GmbH (Germany), a subcontractor to GAMA Industry.