COPPER / ZINC BENEFICIATION PLANT

Copper / Zinc Beneficiation Plant

GAMA Industry performed turnkey construction of the surface facilities for the copper/zinc beneficiation plant including partial basic and detail engineering and local equipment/material supply.

AKSA – Acrylic Plant Modernization

Erection of mechanical, equipment and installation of electrical/ instrumentation systems for the modernisation/capacity increase of AKSA Acrylic Plant, consisting of the following sections: Charge preparation unit, Polymerisation unit, Solvent unit, D.O.P unit, Autoclave unit, Packaging unit.

Izmit Domestic and Industrial Water Supply Project, Yuvacik Dam

The project mainly consists of the construction of an earthfill dam, installation of a total of 133,290 linear meters of steel and ductile iron water transmission pipe-lines and construction of two booster pumping stations in Built-Operate-Transfer basis.

2×8 MW Cumra Sugar Factory Power Plant

GAMA Power Systems implemented turnkey design, supply and construction of a coal fired power plant, comprising 2 sets Babcock & Wilcox licensed 75 ton/hr (38 bar (a), 425°C) steam supply. Circulated Fluidized Bed (CFB) boiler, 2 sets Siemens steam turbine generators and one ea. 38 bar (a), 425°C steam supply, 60 ton/hr. capacity package type boiler, coal and limestone storage buildings including all auxiliary components.

Revamping of PETKIM Naphtha Steam Cracking Plant

The Plant modification works relevant with revamping project for the expansion of the plant capacity from 400,000 ton/year to 520,000 ton/year ethylene are implemented on turnkey EPC basis.

TUPRAS Izmir Refinery – CCR and Isomerization Plants

The existing refinery is extended with two new units to increase the capacity for high-octane-fuel and to produce unleaded-fuel.

Besides CCR and Isomerization Units a new cooling tower, a flare unit, three storage tanks were supplied and connections of existing and new units are performed.

This turn-key project is executed by FWI (Italy) and GAMA Industry Consortium.

Hereke Cement Plant

Design, construction, manufacturing and complete mechanical and electrical erection of 1 ea. complete crushing unit, 1,500 t/hr capacity 1 ea. complete pre-homogenising unit; 50,000 ton storing, 1,800 t/hr stacking and 800 t/hr reclaiming capacity 1 ea.

Ankara Metro System, Phase 1

Turnkey construction of 14.6 km heavy rail transit system, 7 km being underground with 12 passenger stations including an operation and maintenance center with parking facility.

GAMA – Guris Joint Venture (50%-50%) executed the detailed design, procurement, construction, test and commissioning of complete civil and building works – incluidng tunneling, building services and tunnel ventilation and installation of all electrical and mechanical subsystems.

The system is equipped with 108 vehicles operating in six-car trains of triplets with 90 second headway moving block automatic train control (ATC) system.

Ankara Cement Plant

GAMA Industry performed construction and erection of 1,500 ton/day capacity clinker production line as an extension to the existing factory, including crushing plant, raw materials grinding plant, preheater, kiln, dedusting unit and other associated systems including power supply system.