THE GIL ATHLONE GENERATION FACILITY

THE GIL ATHLONE GENERATION FACILITY

GAMA Construction Ireland Limited (GCIL) was awarded as being the EPC Contractor for construction of the GIL Athlone Generation Facility on EPC basis whose scope of works covers the design & equipment / material supply within the BOP boundaries including Grid Connection work and services of overall project scope in compliant with local regulations, international Codes & Standards, and EirGrid Specifications.

THE GIL PROFILE PARK GENERATION FACILITY

GAMA Construction Ireland Limited (GCIL) was awarded as being the EPC Contractor for construction of the GIL Profile Park Generation Facility on EPC basis whose scope of works covers the design & equipment / material supply within the BOP boundaries including Grid Connection work and services of overall project scope in compliant with local regulations, international Codes & Standards, and EirGrid Specifications.

Khurais Gas & Oil Separation Plant

The Khurais project as a whole covers three oilfields: Khurais, Abu Jifan and Mazalij. Throughout this region there are numerous gas oil separation plants (GOSPs), which provide the initial separation of water and gas from the oil prior to shipment to Abqaiq for further processing.

GAMA Industry provided civil, infrastructure, structural, architectural, electromechanical erection works of gas and oil separation plant and make it ready for commissioning.

Ma’aden Sulphuric Acid Plant

The project, consists of 4 main sections; 3 sulphuric acid production plants, each with the capacity of 5,000 tons/day, and a common part serving to these 3 plants, is undertaken by GAMA Industry Arabia Ltd.

3×600 MW Shoaiba IWPP Phase-3

Mechanical erection of 3×600 MW boilers, 3 pcs. electrostatic filter, 1 pcs. ash handling system and 1 pcs. auxiliary boiler including paint touch-up works are implemented.

Tasnee Polyethylene Plant

Construction, structural steel, equipment and piping installation works for the LDPE/HDPE Plant in Jubail city of Saudi Arabia is subcontracted to GAMA Industry Arabia Ltd. by the main contractor Tecnimont Arabia Ltd.

Rabigh Cement Plant Expansion

GAMA performed construction of a new clinker production line with a capacity of 7,000 tons/day starting from and including the new limestone crusher up to and including the packing and bulk loading plant as well as construction work for new power plant and connection to existing lines.