BALLYMUN 74 UNIT DWELLINGS & ASSOCIATED SITE WORKS – BALCURRIS PHASE III

Ballymun 74 Unit Dwellings & Associated Site Works – Balcurris Phase III

The project consists of the construction of 74 dwellings comprising 20 no. 2 bedroom duplex, 5 no 3-bedroom duplex, 17 no. 2-bedroom apartments and 32 no. 3-bedroom houses in 2 storey houses and 3 and 4 storey apartments together with all related ancillary and site development works.

The development at Balcurris 2 represents a further step in the realization of the master plan for the re-construction of Ballymun. The scheme includes 74 new dwellings which are provided in various forms from conventional two-storey terraced houses, to duplex units and ‘own-door’ apartments. A strong streetscape is achieved onto Balbutcherlane using three and four storey forms, with the scale reducing to two storey dwellings to link in with the adjacent Sandyhill Gardens housing estate to the south. All dwellings have sunny aspect terraces or private rear gardens and their own front door.

Epoxy Resin Plant

GAMA Industry performed turnkey construction of 19,700 tons per year capacity Epoxy Resin Plant including the port facilities and product pipeline.

82 Houses, Community Facility, Shop Unit, External Works & Site Development Works – Balgaddy 8A

Construction of 82 houses, community facility, shop unit, external works and site development works.

The brief was to design a new neighborhood of approx. 25 dwellings per acre, encouraging safety and security. The buildings are arranged so that residents overlook all streets and public areas where children can play and ‘hang out’. A shared surface of streets and pavements is complimented by robust ground floor red brick walls with white rendered walls and recessed blue planes above, creating a low maintenance, user-friendly environment. This continues inside the dwellings where residents have high quality timber windows that can be easily cleaned from the inside, easy to use locks and fittings and a very high level of finish generally. This is a new high-density neighbourhood of 84 dwellings for South Dublin County Council. The site is bounded to the north and west by existing residential development and a small hospital, to the south by a busy road and to the east by the local school grounds.

N2 Clontibret to Castleblayney Road Scheme

The total length of the road is 15.8 km, which is constructed 2+1 lanes in high quality. Moreover, there are 12 bridges constructions in the scope of the project, 6 of which are underpass bridges and 6 Culverts. Monaghan County Council propose to realign the N2 National Primary Route over a length of 15.9 km between the town lands of Moy Otra, near Clontibret village, and Drumcrew on the Carrickmacross Road, just south of Castleblayney.

The project includes for the provision of a 2+1 lane road, a three-lane road with two lanes in one direction of travel and one lane in the other. This road type provides safe two-lane overtaking zones, which alternate with one-lane sections, at intervals of approximately 2 km. The traffic streams are separated by a safety barrier which prevents overtaking manoeuvres on the single-lane sections. Right turning will only be permitted at designated junctions to reduce the number of conflict areas and to enhance safety.

100+147 Houses and Community Facility

Balgaddy Scheme consists of 100+147 residential units arranged in urban blocks as apartments, duplexes and terraced houses. The development is designed to cater for all types of residents including disabled, single persons and large families.

The development is not only cater for social housing but also provides housing for voluntary housing associations, co-operative housing groups and private purchasers. The scheme is a continuation of the urban block format of Balgaddy A-B with tree-lined avenues culminating in a new park bounded on the other side by Balgaddy D (by South Dublin County Council Architects). The scheme is part of an overall master plan being administered by a number of architectural practices and South Dublin County Council that will provide over 600 residential units in the South Lucan area. The basic design concept of Balgaddy B and C is that of densification, consolidation and urbanization of under utilized lands. Balgaddy E is a new mid density neighborhood of 100 dwellings and 2 shops for South Dublin County Council.

3×600 MW Shoaiba IWPP Phase-3

Mechanical erection of 3×600 MW boilers, 3 pcs. electrostatic filter, 1 pcs. ash handling system and 1 pcs. auxiliary boiler including paint touch-up works are implemented.

Ma’aden Sulphuric Acid Plant

The project, consists of 4 main sections; 3 sulphuric acid production plants, each with the capacity of 5,000 tons/day, and a common part serving to these 3 plants, is undertaken by GAMA Industry Arabia Ltd.

Khurais Gas & Oil Separation Plant

The Khurais project as a whole covers three oilfields: Khurais, Abu Jifan and Mazalij. Throughout this region there are numerous gas oil separation plants (GOSPs), which provide the initial separation of water and gas from the oil prior to shipment to Abqaiq for further processing.

GAMA Industry provided civil, infrastructure, structural, architectural, electromechanical erection works of gas and oil separation plant and make it ready for commissioning.